About
The existing pavement in this section of I-5 is damaged. The driving surface is rapidly cracking and will continue to do so to the point where our maintenance crews won't be able to repair.
For this project, we'll:
- Remove the existing pavement and repave.
- Add new permanent striping.
- Add back in the existing shoulder rumble strips.
- Repair bridge surfaces and joints as needed.
- Repair or replace guardrail.
This work will help extend the road and bridges' useful life and give travelers a smoother ride. Adding shoulder rumble strips alerts inattentive or drowsy drivers that they've drifted out of their lane.
Schedule
Design: 2023-2025
Construction: 2026
Location
I-5
|
Milepost 169.2 to 175.02
Cost and Funding
Estimated total cost: $19,728,432