I-5: Cottage Grove - Martin Creek Road Repairs

Construction Phase

Region 2: Willamette Valley and Northwest Oregon (Cottage Grove, Lane)


​​​​​​​​​​​​​​We're repaving and applying permanent striping on a section of I-5 in both directions in Cottage Grove.​


Banner: Slow down, in the work zone it could save lives. Building a modern transportation system to help Oregon’s communities and economy thrive. During construction, Give yourself more time, try a new way or mode to get there or take a different route.

Impacts

Traffic Impact

​Expect crews working at night with single lane, shoulder and ramp closures as needed. Use caution and watch for workers.

Construction Impacts

Drivers can expect two weekends of northbound I-5 lane closures near Cottage Grove:

  • Friday, July 24, through Sunday, July 26.
    You can also expect the northbound I-5 Exit 174 to close starting at 12 p.m. on Saturday, July 25. 
  • Friday, July 31, through Sunday, August 2.

You can expect:

  • Crews mostly working at night, from 7 p.m. to 8 a.m.
  • The speed limit to be reduced to 55 mph in the work zone.​
  • Single lane, shoulder and ramp closures as needed.
  • ​Construction noise and delays.
Visit TripCheck.com​ for the most up-to-date information on ramp closures. 

Construction Activities

We're working on repairing or replacing the guardrail. Then we'll repair and replace the bridge surface and joints as needed.

​Visit TripCheck​ for the most current traffic information.​


​Pedestrians, including those with disabilities, will have access through or around work zones. ​


work zone construction iconPay attention in the work zone, slow down and move over – imagine this is where you work! 

Always drive safely, watch for construction signs and workers. 

Remember: fines double in all Oregon work zones, whether workers and signs are present or not. ​​​

Details

About

​​The existing pavement in this section of I-5 is damaged. The driving surface is rapidly cracking and will continue to do so to the point where our maintenance crews won't be able to repair.

For this project, we'll:

  • Remove the existing pavement and repave. 
  • Add new permanent striping.
  • Add back in the existing shoulder rumble strips.
  • Repair bridge surfaces and joints as needed.
  • Repair or replace guardrail.

This work will help extend the road and bridges' useful life and give travelers a smoother ride. Adding shoulder rumble strips alerts inattentive or drowsy drivers that they've drifted out of their lane.

Schedule

Design: 2023-2025
Construction: 2026

Location

I-5 |

​Milepost ​169.2 to 175.02

Cost and Funding

​Estimated total cost: $19,728,432​​

Contacts & Media

Project area map

Project Contacts

Assistant Resident Engineer
Patrick Woodhurst
Email
patrick.j.woodhurst@odot.oregon.gov
Phone
541-525-4945

Public Information Officer
Mindy McCartt
Email
mindy.m.mccartt@odot.oregon.gov
Phone
503-507-6045

Get Project Alerts

Sign up for the newsletter!

Last Updated

7/15/2026 2:37 PM

Project Number

22938