I-84: (Multi-Use Path) Jordan Road Tunnel - Sandy River Delta

Design Phase

Region 1: Portland metro and Hood River County (Troutdale)


​​We're building a new multi-use path parallel to Jordan Road from the pedestrian tunnel under I-84 to the Sandy River Delta, increasing safer connections for people who walk, bike or roll.​


Impacts

Traffic Impact

During construction, travelers, including pedestrians and bicyclists can expect:

  • No lane closures are planned on I-84. 
  • The I-84 westbound exit ramp may experience some delays due to flagger control on Jordan Road.
  • Periodic single lane closures on Jordan Road, with flaggers directing traffic as needed. 
  • The pedestrian and bicycle tunnel under I-84 will remain open during Phase 1 (main path construction) but will temporarily close only during Phase 2 (path connection to tunnel).
  • Pedestrians and bicyclists can expect a temporary detour route using an existing trail close to the construction site; watch for signage..
  • Existing, designated trails will remain open other than the area under construction.
  • The parking lot for the Sandy River Delta recreational area will remain open. 

Construction Impacts

Construction will occur parallel to Jordan Road between the I-84 pedestrian tunnel and the Sandy River Delta. Periodic lane closures under flagger control are expected on Jordan Road. 

See the "Traffiic Impact" section for more information about traffic impacts during construction.

Schedule

​Construction is expected to begin in early 2026 and continue through late summer 2026. The project schedule is subject to change.

Details

About

​This project will construct a new multi-use path parallel to Jordan Road between the I-84 pedestrian tunnel and the Sandy River Delta.  The path connects to the existing pedestrian and bicycle tunnel underneath I-84 and will provide a paved, designated path for visitors walking, biking or rolling into the Sandy River Delta.

IMG_0998.jpg

Pictured above: view of the existing conditions where we will build a new multi-use path parallel to Jordan Road near I-84 at Exit 18.

Location

I-84 |

​I-84  at Exit 18 in Troutdale (Sandy River Delta) - from Jordan Road to the Sandy River Delta.

Cost and Funding

$3.4 million

Contractor

​We will provide the name of the contractor once they have been selected.

Benefits

​The new paved multi-use path will create a safer connection to the existing 40-mile trail system, replacing the unimproved gravel path.

Additional Information

Over the next several years, we have many construction projects planned on I-84 between I-205 and Hood River, and on the Historic Columbia River Highway between Troutdale and Hood River. 

More information.

​​For ADA (Americans with Disabilities Act) or Civil Rights Title VI accommodations, translation/interpretation services, or more information call 503-731-4128, TTY 800-735-2900 or Oregon Relay Service 7-1-1.

¿Habla usted español? Podemos proveer la información en esta publicación en español. Para recibir la información en español, por favor llamé al (503) 731-4128.

Если вы хотите, чтобы информация об этом проекте была переведена на русский язык, пожалуйста, звоните по телефону  503-731-4128. 

Nếu quý vị muốn thông tin về dự án này được dịch sang tiếng Việt, xin gọi 503-731-4128. 

이 프로젝트에 관한 한국어로 된 자료 신청방법 전화: 503-731-4128. 

如果您想瞭解這個項目翻譯成繁體中文的相關資訊,請致電 503-731-4128. 

如果您想了解这个项目翻译成简体中文的相关信息,请致电 503-731-4128.

Contacts & Media

Project Contacts

Community Affairs Coordinator
Dee Hidalgo
Email
dee.hidalgo@ODOT.oregon.gov
Phone
503-731-8230

Columbia River Gorge National Scenic Area Coordinator
Terra Lingley
Email
Terra.M.Lingley@odot.oregon.gov
Phone
503-731-8232
Project Accommodation Request
503-731-4128

Last Updated

12/11/2025 12:36 PM

Project Number

23428