Traffic Impact
When geotechnical drilling work begins, travelers should expect:
- Daytime single lane closures
- Right turns prohibited at the intersection of N. Lombard and N. Denver Avenue with detour routes.
- Temporary sidewalk and crosswalk closures.
- Closures will have signed, temporary pedestrian accessible detour routes during drilling activities.
We will continue to provide more information about traffic impacts during fieldwork activities and when we get closer to the construction phase.
Construction Impacts
Fieldwork
Geotechnical drilling activities are being scheduled in December 2026 to test water drainage and soil conditions. When work begins, travelers should expect daytime lane closures. Work may also require temporary sidewalk and crosswalk closures. Closures will have signed, temporary pedestrian accessible detour routes during drilling activities.
What to Expect
Crews are planning one day of geotechnical drilling in December at one location at the intersection of N. Lombard Street at N. Denver Ave. to test water drainage and soil conditions. The southbound slip lane on N. Denver Ave. will be closed for this work for one day between 7 a.m. and 5 p.m. Right turns from N. Lombard to N. Denver Ave. will not be permitted. A detour using North Interstate Ave. will be provided.
Noise Impacts
People working or living in the area may hear the noise from heavy construction equipment, beeping noise when vehicles are in reverse (required by the Occupational Safety and Health Administration) and equipment such as drill rigs and vacuum excavators. Noise will take place periodically from 7 a.m. and 5 p.m.
For concerns about nighttime noise during fieldwork activities for the project, contact the noise hotline at 503-412-2349.
We will provide more information about construction impacts when we get closer to the construction phase.
Schedule
The project is currently in the design phase. Construction is anticipated to begin in 2028.
The project schedule is subject to change.