Project-Details



US30B: (N Lombard St) N Delaware Ave - N Denver Ave

Design Phase

Region 1: Portland metro and Hood River County (Portland, Multnomah)


​​​​We are designing safety improvements for all users along U.S. 30 Bypass (North Lombard) from North Delaware to North Denver avenues which include reconfiguring the road to add a center turn lane, adding bike lanes, upgrading sidewalk curb ramps and implementing a variety of safety improvements and upgrading the existing traffic signal at North Denver Avenue.​


Impacts

Traffic Impact

When geotechnical drilling work begins, travelers should expect:
  • Daytime single lane closures
  • Right turns prohibited at the intersection of N. Lombard and N. Denver Avenue with detour routes.
  • Temporary sidewalk and crosswalk closures. 
  • Closures will have signed, temporary pedestrian accessible detour routes during drilling activities.

​​We will continue to provide more information about traffic impacts during fieldwork activities and when we get closer to the construction phase.

Construction Impacts

​Fieldwork

Geotechnical drilling activities are being scheduled in December 2026 to test water drainage and soil conditions. When work begins, travelers should expect daytime lane closures. Work may also require temporary sidewalk and crosswalk closures. Closures will have signed, temporary pedestrian accessible detour routes during drilling activities.

​What to Expect

Crews are planning one day of geotechnical drilling in December at one location at the intersection of N. Lombard Street at N. Denver Ave. to test water drainage and soil conditions. The southbound slip lane on N. Denver Ave. will be closed for this work for one day between 7 a.m. and 5 p.m. Right turns from N. Lombard to N. Denver Ave. will not be permitted. A detour using North Interstate Ave. will be provided.

Noise Impacts

People working or living in the area may hear the noise from heavy construction equipment, beeping noise when vehicles are in reverse (required by the Occupational Safety and Health Administration) and equipment such as drill rigs and vacuum excavators. Noise will take place periodically from 7 a.m. and 5 p.m.

For concerns about nighttime noise during fieldwork activities for the project, contact the noise hotline at 503-412-2349.
​

We will provide more information about construction impacts when we get closer to the construction phase.

Schedule

​The project is currently in the design phase. Construction is anticipated to begin in 2028. 

The project schedule is subject to change.

Details

About

​The project will improve safety for all users along a section of North Lombard Street between North Delaware and North Denver avenues by adding new bike lanes on the north and south sides of Lombard, adding a center turn lane, paving, pedestrian improvements, upgrading sidewalk curb ramps at specific locations to meet ADA requirements and upgrading the existing traffic signal on North Lombard at North Denver Avenue. 

Location

U.S. 30BY |

​U.S. 30BY (North Lombard Street) from N. Delaware Avenue to N. Denver Avenue

Cost and Funding

$3.7 Million

Additional Information

​For ADA (Americans with Disabilities Act) or Civil Rights Title VI accommodations, translation/interpretation services, or more information call 503-731-4128, TTY 800-735-2900 or Oregon Relay Service 7-1-1.​ 

Si desea obtener información sobre este proyecto traducida al español, sírvase llamar al 503-731-4128. 

Если вы хотите, чтобы информация об этом проекте была переведена на русский язык, пожалуйста, звоните по телефону 503-731-4128. 

Nếu quý vị muốn thông tin về dự án này được dịch sang tiếng Việt, xin gọi 503-731-4128.​ 

이 프로젝트에 관한 한국어로 된 자료 신청방법 전화: 503-731-4128. 

如果您想瞭解這個項目翻譯成繁體中文的相關資訊,請致電 503-731-4128. 

如果您想了解这个项目翻译成简体中文的相关信息,请致电 503-731-4128.

Contacts & Media

Project Contacts

Community Affairs Coordinator
Dee Hidalgo
Email
dee.hidalgo@ODOT.oregon.gov
Phone
503-731-8230

Public Information Officer
David House
Email
david.j.house@odot.oregon.gov
Phone
503-551-8641
Project Hotline
503-412-2349 (Noise Hotline)
Project Accommodation Request
503-731-4128

Last Updated

11/12/2026 12:36 PM

Project Number

23636