About
Phase 1 – Mitchell to I-84
This 0.25- mile segment of trail will extend eastward from Mitchell Point on Mitchell Point Drive and construct a separate bicycle and pedestrian tunnel underneath I-84 just west of the existing one-way vehicle undercrossing. The design would retain one-way vehicle traffic in the existing tunnel with a separated two-way path for trail users.
Future Phases – I-84 Undercrossing to Ruthton Trailhead
This 1.2-mile segment of trail will extend eastward from the phase 1 undercrossing at I-84, and proceed east to Hood River. We will build a trail on the north side of I-84 to connect with Ruthton Park, including restoring a section of original Historic Highway and building a new trailhead.
Location
U.S. 30Cost and Funding
Design is funded through the Federal Lands Access
Program and ODOT funds. Construction for Phase 1 is through the Nationally
Significant Federal Lands and Tribal Program.