Number
|
Title
|
Date Rescinded |
Where Covered
|
Access Management
|
AM05-01
|
Administrative Fee for Highway Approach Applications |
08/08/2005 |
Information covered in AM05-02(B), which is also Rescinded (see below) |
| AM05-02(B) |
Administrative Fee for Application for State Highway Approach OAR 734-051 |
04/24/2008 |
ORS 374.310 amended to prohibit fess for approach road applications |
| AM08-01(D) |
Guideline and Resources for Access Management in Project Development |
04/24/2008 |
Information now contained in Volume 1, Chapter 3 of the Access Management Manual.
|
| Bridge Engineering |
| BR06-01(B) Former # BR02-B-001 |
Bridge Document Standards and Process |
11/14/2007 |
Now listed in BDDM 1.1.1 Temporary structure design requirements are now included in BDDM 1.4.9.2 |
BR2005-01
|
Applicable AASHTO Bridge Design Specification for Permanent and Temporary Bridges |
11/14/2007 |
What Bridge needs at Completion of a Design Project is now in BDDM2.1.3.2. Step by step procedures for the mylar process is now in BDDM 2.1.3.1
|
| Geo-Environmental |
| GE09-01(B) |
Geo-Hydro-Environmental Design Drawing Order and Sheet Numbering |
06/18/2012 |
This guidance is now included in Chapter 2 of the Contract Plans Development Guide (CPDG). |
GE09-02(B)
|
Stormwater Management Program
|
02/16/12 |
This guidance is now included in Chapter 14, ODOT Hydraulics Manual
|
GE09-08(B)
|
Drainage Field Markers |
02/16/12 |
This guidance is now included in Chapter 17, ODOT Hydraulics Manual
|
GE10-01(B)
|
Stormwater Treatment and Storage Facility Field Markers
|
02/16/12 |
This guidance is now included in Chapter 17, ODOT Hydraulics Manual
|
| Right of Way |
| RW07-01(B) |
Offer-Benefit Letter (Rescinding) |
09/26/12 |
This guidance can now be found in the Right of Way Manual, chapters 5 and 6. |
| RW09-01(B) |
Utility Relocation - Minor Non-Reimbursable Relocations |
12/01/10 |
This guidance can now be found in the Right of Way Manual, chapter 10.
|
| RW09-02(B) |
Utility Relocation - Utility Billing Process |
12/01/10 |
This guidance can now be found in the Right of Way Manual, chapter 10.
|
| RW09-03(B) |
Utility Relocation - Utility Certification Process |
12/01/10 |
This guidance can now be found in the Right of Way Manual, chapter 10.
|
| Technical Services |
TSB08-01(D)
|
Hydraulics Design Deviation Requests
|
02/16/12 |
This guidance is now included in Chapter 3, ODOT Hydraulics Manual
|
| Traffic-Roadway Engineering |
| Traffic |
| TR05-07(A) |
Loop Wiring Diagram to Show Loop Distance Dimensions(Distance from STOP line to center of loop) |
08/14/2008 |
This guidance can now be found in Signal Design Manual Chapter 3. |
| TR05-08(A) |
Maintenance Pads |
08/14/2008 |
This guidance can now be found in Signal Design Manual Chapter 8. |
| TR05-09(A) |
Traffic Signal Battery Backup |
08/14/2008 |
This guidance can now be found in the 2006 Traffic Signal Policy and Guidelines Section X. |
| TR05-10(A) |
Junction Box Spacing |
08/14/2008 |
This guidance can now be found in the 2008 Standard Specifications for Construction Section 960. |
| TR05-01(B) |
Pole Entrance Chart Format Change |
08/14/2008 |
This guidance can now be found in Signal Design Manual Chapter 1. |
| TR05-02(B) |
Minimum Conduit Size Change |
08/14/2008 |
This guidance can now be found in Signal Design Manual Chapter 3. |
| TR05-03(B) |
TEOS Drawing Number Requests |
08/14/2008 |
This guidance can now be found in Signal Design Manual Chapter 14. |
| TR05-04(B) |
Traffic Signal Controller Cabinet Prints |
08/14/2008 |
This guidance can now be found in Signal Design Manual Chapter 13. |
| TR05-05(B) |
Loop Detector Spacing |
08/14/2008 |
This guidance can now be found in Signal Design Manual Chapter 13. |
| TR05-06(B) |
1” Metallic Chase Nipple Wire Entrance on Mast Arms |
08/14/2008 |
This guidance can now be found in Standard Drawing TM462. |
| TR05-08 |
Removal of Speed Zone Signs on State Highways |
10/15/2007 |
This guidance can now be found in the Traffic Manual |
TR06-01(B) Former #TR06-01
|
Mandatory use of Traffic Signal Pole Standard Drawings TM650, TM651, TM652, and TM 653 |
06/18/2008 |
This guidance can now be found in the Traffic Structures Manual
|
| TR06-02 |
Marked Crosswalks at Uncontrolled Locations |
05/01/2008 |
This guidance can now be found in the Traffic Manual |
| TR06-03(B) |
Speed Limit Signing in School Zones |
05/31/2012 |
This guidance can now be found in the ODOT Sign Policy and Guidelines, Chapter 7. |
| TR06-04B |
Striping |
12/07/2008 |
This guidance can now be found in the Traffic Manual
|
| TR07-02(B) |
Dotted lines used across left-hand exits and left turn lane gap sections |
09/04/2009 |
This guidance can now be found in the Traffic Line Manual |
| TR07-03(B) |
Signal Pole Foundation Depths |
12/18/2009 |
This guidance can now be found in the Traffic Structures Manual and the Geotechnical Manual |
| TR07-04(B) |
TCP Design Manual Update Chapter 4 |
05/01/2008 |
This guidance can now be found in the Traffic Control Plans Manual
|
| TR07-05(B) |
Design Standards for Development of Temporary Freeway Crossover |
05/01/2008 |
This guidance can now be found in the Traffic Control Plans Manual
|
| TR07-09(B) |
Street Name Signs and Guide Signs on Traffic Signal Poles |
09/14/2009 |
This guidance can now be found in Signal Design Manual Chapter 1. |
| TR07-11(B) |
Right Turn Acceleration Lanes |
12/30/2009 |
This guidance can now be found in the Traffic Manual& the Highway Design Manual.
|
| TR10-01(B) |
Implementation of Douglas Fir No. 1 Wood Sign Posts |
07/01/2012 |
The information for use of Douglas Fir No. 1 Wood Sign Posts has been added to Standard Drawing TM671 and Specification Section 02110.40. Douglas Fir No. 1 is being used by designers for wood sign posts on ODOT projects and this guidance is no longer required. |
| Roadway |
RD05-01(B)
|
Horizontal and Vertical Clearances for Large Loads on Interstate Freeways |
11/23/2007 |
This guidance can now be found in the Highway Design Manual. |
RD05-02(B)
|
Trees in Medians
|
11/23/2007 |
This guidance can now be found in the Highway Design Manual |
| RD05-03(B) |
Guardrail Terminal Upgrades |
11/23/2007 |
This guidance can now be found in the Highway Design Manual |
RD06-01(B) Former# HDM06-01
|
Railroad Crossing Clearances
|
02/06/2009 |
This guidance can now be found in the Highway Design Manual |
RD06-02(B)
|
Plan Sheet Title Block Changes
|
02/06/2009 |
This information is now located in the Contract Plans Development Guide, Bridge Design and Drafting Manual, and the ODOT Signal Design Manual.
|
RD06-03(B)
|
Placement of Street Trees in Urban Areas Within the Clear Zone
|
02/06/2009 |
This guidance can now be found in the Highway Design Manual. |
| RD07-01(B) |
2004 AASHTO “A Policy on Geometric Design of Highways and Streets” (Green Book) Adoption |
11/01/2012 |
This guidance can now be found in the Highway Design Manual. |
| RD07-04(B) |
Change to Chapter 13 Highway Design Manual |
12/30/2009 |
This guidance can now be found in the Highway Design Manual. |
| RD07-06(B) |
Project Bid Advertisement Period |
12/01/2009 |
This guidance can now be found in the PSE Delivery Manual. |
| RD07-07(B) |
Rules for Posting Addenda |
12/01/2009 |
This guidance can now be found in the PSE Delivery Manual. |
| RD07-09(B) |
Guidance for the Use of Cable Barrier on Highways |
09/21/2009 |
This guidance can now be found in the Highway Design Manual |
| RD07-09(B) |
Revision to ADA Sidewalk Ramp Section of Urban 3-R Preservation Strategy |
11/01/2012 |
This guidance can now be found in the Highway Design Manual. |
| RD08-01(B) |
Median width and barrier warrant on the Interstate Freeway System. |
11/01/2012 |
This guidance can now be found in the Highway Design Manual. |
| RD08-03(B) |
Channelization & Intersection details |
11/01/2012 |
This guidance can now be found in the Highway Design Manual. |
| RD09-04(B) |
Note and Label Capitalization on Plan Sheets |
07/01/2012 |
This guidance is now included in the Contract Plans Development Guide (CPDG). |
| RD09-06(B) |
Update Signature Block on Title Sheet (Note - this document previously superseded RD08-02(B)) |
07/01/2012 |
This guidance is now included in the Contract Plans Development Guide (CPDG). |