Skip to main content

Oregon State Flag An official website of the State of Oregon »

Project-Details







U.S. 26 (SE Powell Blvd) and SE 92nd Ave Curb Ramp Improvement Project

Project Completed

Region 1: Portland metro and Hood River County (Portland, Multnomah)


​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​We​​​​ created safer and more accessible highway connections for all sidewalk users on U.S. 26 (SE Powell Boulevard). We are bringing sidewalk curb ramps into compliance with Americans with Disabilities Act (ADA) standards on highways throughout Oregon, including on all corners of the intersection of U.S. 26 (SE Powell Boulevard) at SE 92nd Avenue. 

Impacts

Traffic Impact

There are no traffic impacts. The project is complete.

Thank you for your patience during this project as we worked to improve safety and accessibility for all sidewalk users on U.S. 26 (Powell Boulevard and 92nd Avenue).

Construction Impacts

There are no construction impacts. The project is complete.​​

Schedule

Construction was completed in summer 2025. 

Details

About

We upgraded sidewalk curb ramps at all corners of the intersection of U.S. 26 (SE Powell Boulevard) and SE 92nd Avenue. ​ 

Work at the intersection included:

Upgrading existing sidewalk curb ramps to meet ADA standards
  • ​We installed ADA accessible sidewalk curb ramps at all corners of the intersection of SE Powell Boulevard and SE 92nd Avenue. New sidewalk curb ramps meet Americans with Disabilities Act (ADA) standards and improves safety and accessibility for all, including people using mobility devices and people with visual impairments.
Example photo of a completed ADA sidewalk curb ramp
Curb Ramp_After.png
Pictured above: Upgraded curb ramp and audible pedestrian signal at the intersection of U.S 26 (Powell Boulevard) and 92nd Avenue before (top) and after (bottom) ADA compliant upgrades.

Lowered crosswalk buttons and installed audible pedestrian signals 

  • Helps all pedestrians cross the street safely by making the crosswalk buttons more reachable and provides an audible cue for the crosswalk signal.
Example photo of a lowered crosswalk button at a crosswalk.
Intersection_After.jpg
Pictured above: Upgraded curb ramp, crosswalk buttons and audible pedestrian signals at the intersection of U.S 26 (Powell Boulevard) and 92nd Avenue before (top) and after (bottom) ADA compliant upgrades.

Restriped and realigned crosswalks 

  • ​Improves visibility and creates a direct path from curb to curb, increasing pedestrian safety while crossing the street.
Example of a restriped and realigned crosswalk.
Intersection 2_After.jpg
Pictured above:  Upgraded curb ramp and crosswalk striping at the intersection of U.S 26 (Powell Boulevard) and 92nd Avenue before (left) and after (right) ADA compliant upgrades.

Replaced vehicle detectors at the intersection 

  • Improves vehicle detection when approaching the traffic signal for efficient signal operations.

Other Projects in the Area 
Additional ODOT and partner agency project investments continue along Powell Boulevard. Please visit www.tinyurl.com/SEPowellBlvdImprovements for more information about other projects occurring along the corridor.

ODOT ADA Program

ODOT is bringing more than 25,000 curb ramps throughout Oregon into compliance with Americans with Disabilities Act (ADA) standards.

We are committed to new standards for accessible routes through work zones, outreach and addressing public concerns. Everyone who uses sidewalks along our highways will benefit from this commitment and the improvements we make to the curb ramps. Please visit the project website www.R1ADA.org for more information.

Location

U.S. 26 |

U.S. 26 (SE Powell Boulevard) and SE 92nd Avenue

Cost and Funding

$2.1 million​

Contractor

Brown Contracting, Inc.

Benefits

Completed improvements allows all users, including people using wheelchairs and mobility aids, to make a smooth transition from the street to the sidewalk.

Additional Information

​For ADA (Americans with Disabilities Act) or Civil Rights Title VI accommodations, translation/interpretation services, or more information call 503-731-4128, TTY 800-735-2900 or Oregon Relay Service 7-1-1. 

​Si desea obtener información sobre este proyecto traducida al español, sírvase llamar al 503-731-4128.

​Если вы хотите, чтобы информация об этом проекте была переведена на русский язык, пожалуйста, звоните по телефону 503-731-4128.

如果您想瞭解這個項目翻譯成 繁體中文 的相關資訊,請致電(503)731-4128. 如果您想了解这个项目翻译成 简体中文 的相关信息,请致电503-731-4128 .

이 프로젝트에 관한 한국어로 된 자료 신청방법 전화: 503-731-4128. 

Nếu quý vị muốn thông tin về dự án này được dịch sang tiếng Việt, xin gọi 503-731-4128.

Contacts & Media

Videos


View on YouTube

Project Contacts

Community Affairs Coordinator
Dee Hidalgo
Email
dee.hidalgo@ODOT.oregon.gov
Phone
503-731-8230

Public Information Officer
David House
Email
david.j.house@odot.oregon.gov
Phone
503-551-8641
Project Accommodation Request
503-731-4128

Get Project Alerts

Sign up for the newsletter!

Last Updated

7/25/2025 12:29 PM

Project Number

21255

Project Documents

Related documents to this project
K21255 U.S. 26 and 92nd Ave Curb Ramp Improvement Project Fall 2024.pdfA PDF document with a project area map of curb ramp improvements on Powell Boulevard at 92nd Avenue (English).
K21255 U.S. 26 and 92nd Ave Curb Ramp Improvement Project Fall 2024-Spanish.pdfA PDF document with a project area map of curb ramp improvements on Powell Boulevard at 92nd Avenue (Spanish).