Skip to main content

Oregon State Flag An official website of the State of Oregon »

Deschutes Groundwater Mitigation Program

Program overview
Surface water flows in the Deschutes River and many of its tributaries are protected with State Scenic Waterway designations and/or instream water rights. In addition, there are hundreds of existing surface water rights for various out-of-stream uses. Owing to the significant hydraulic connection between groundwater and surface water within the Deschutes Basin, the Oregon Water Resources Department (OWRD) must jointly manage groundwater and surface to ensure that new groundwater uses do not diminish streamflows. The Deschutes Groundwater Mitigation Program (Mitigation Program) was established in the early 2000s to provide a pathway for new permitted groundwater use while maintaining flows for scenic waterways and senior surface water rights, including instream water rights. 

Program evaluations

OWRD conducts annual reviews of Mitigation Program and more comprehensive program evaluations every five years. Previous annual and five-year reports can be accessed via the Mitigation Program Evaluation link to the left. The final version of the 2026 five-year evaluation report can be accessed below, along with comments received on the report.

Deschutes Mitigation Program Legislative Report (2020-2025) 

Comments received on the 2020-2025 Deschutes Mitigation Program Report 
(Coming soon)

Public meetings 

Upcoming meetings:

Groundwater Advisory Committee (GWAC) meeting on December 8, 2026 (hybrid)
  • See website for more information, including forthcoming agenda and virtual access information
Water Resources Commission (WRC) meeting on December 10–11, 2026 (hybrid)
  • See website for more information, including forthcoming agenda and virtual access information

Recent public meeting materials and recordings are available below.