Text Size:   A+ A- A   •   Text Only
ODOT Logo
Special Provision Updates
General Information
Updates for Calendar Year 2012
Updates for Calendar Year 2011
General Information
cover image
 
Updates to ODOT's Standard Specifications and Boiler Plate Special Provisions are made and published 10 weeks before they become effective and always correspond to a bid opening date.
 
This web page provides the updates in a format that you can see the changes that have been made.
 
MS Word formatted versions are available on the Boiler Plate Special Provisions page.
 
The updates must be incorporated into ODOT projects as specified below.
 
If you would like to be notified when the Boiler Plate Special Provisions are updated, add your name to our email mailing list by filling out and submitting the Update Notification form.

Updates for Calendar Year 2012
 
APRIL 12, 2012 (02-02-12 update)
There are no boiler plate special provision updates for this bid opening.
 
APRIL 05, 2012 (01-26-12 update)
There are no boiler plate special provision updates for this bid opening.
 
MARCH 29, 2012 (01-19-12 update)
There are no boiler plate special provision updates for this bid opening.
 
MARCH 22, 2012 (01-05-12 update)
UPDATES TO BE INCLUDED IN MARCH 22, 2012 AND LATER PROJECTS:
SP150 - CONTROL OF WORK
SP842 - FACILITY IDENTIFICATION MARKERS [NEW]
SP1010 - STORMWATER CONTROL, WATER QUALITY STRUCTURES [NEW]
SP1011 - STORMWATER CONTROL, PONDS [NEW]
SP1012 - STORMWATER CONTROL, WATER QUALITY BIOFILTRATION SWALE [NEW]
SP1013 - STORMWATER CONTROL, WATER QUALITY BIOSLOPE [NEW]
SP1014 - STORMWATER CONTROL, WATER QUALITY FILTER STRIP [NEW]
SP1092 - STORMWATER CONTROL FACILITIES [DELETED]
 
MARCH 08, 2012 (12-22-11 update)
UPDATES TO BE INCLUDED IN MARCH 08, 2012 AND LATER PROJECTS:
BB001 - DESCRIPTION OF WORK PAGE FOR BID BOOKLET
SP120 - BIDDING REQUIREMENTS AND PROCEDURES
SP130 - AWARD AND EXECUTION OF CONTRACT
SP165 - QUALITY OF MATERIALS 
 
FEBRUARY 23, 2012 (12-15-11 update)
UPDATES TO BE INCLUDED IN FEBRUARY 23, 2012 AND LATER PROJECTS:
SP170 - LEGAL RELATIONS AND RESPONSIBILITIES
SP557 - PREMIXED POLYMER CONCRETE OVERLAYS
SP559 - SILICA FUME AND LATEX MODIFIED CONCRETE OVERLAYS
 
FEBRUARY 09, 2012 (12-01-11 update)
UPDATES TO BE INCLUDED IN FEBRUARY 09, 2012 AND LATER PROJECTS:
SP851 - PAVEMENT MARKING REMOVAL
SP2910 - SIGN MATERIALS
 
JANUARY 26, 2012 (11-17-11 update)
UPDATES TO BE INCLUDED IN JANUARY 26, 2012 AND LATER PROJECTS:
SP225 - WORK ZONE TRAFFIC CONTROL
SP530 - STEEL REINFORCEMENT FOR CONCRETE
SP559 - SILICA FUME AND LATEX MODIFIED CONCRETE OVERLAYS
SP594 - PREPARING AND COATING METAL STRUCTURES
SP851 - PAVEMENT MARKING REMOVAL
SP2570 - COMPOSITE BEARINGS
SP2910 - SIGN MATERIALS
 
JANUARY 12, 2012 (11-03-11 update)
There are no boiler plate special provision updates for this bid opening.

Updates for Calendar Year 2011
 
DECEMBER 08, 2011 (09-29-11 update)
UPDATES TO BE INCLUDED IN DECEMBER 08, 2011 AND LATER PROJECTS:
SP_TOC_STA - TABLE OF CONTENTS FOR STATE FUNDED PROJECTS
SP150 - CONTROL OF WORK 
 
NOVEMBER 10, 2011 (09-01-11 update)
UPDATES TO BE INCLUDED IN NOVEMBER 10, 2011 AND LATER PROJECTS:
SP_TOC_FED - TABLE OF CONTENTS FOR FEDERAL FUNDED PROJECTS
SP_TOC_STA - TABLE OF CONTENTS FOR STATE FUNDED PROJECTS
SP_EEO_ATP - EEO-ASPIRATIONAL TARGET PROVISIONS
SP_ROJT_RAPP - REIMBURSABLE OJT AND APPRENTICESHIP TRAINING
SP_OJT_FED - FEDERAL ON-THE-JOB TRAINING SPECIAL PROVISIONS
SP170 - LEGAL RELATIONS AND RESPONSIBILITIES
SP744 - MINOR HOT MIXED ASPHALT CONCRETE (MHMAC) PAVEMENT
SP755 - CONTINUOUSLY REINFORCED CONCRETE PAVEMENT
SP857 - RUMBLE STRIPS
 
OCTOBER 27, 2011 (08-18-11 update)
There are no boiler plate special provision updates for this bid opening.
 
OCTOBER 20, 2011 (08-11-11 update)
UPDATES TO BE INCLUDED IN OCTOBER 20, 2011 AND LATER PROJECTS:
SP330 - EARTHWORK
SP503 - BRIDGE DECK COLD PLANE PAVEMENT REMOVAL
SP589 - UTILITY ATTACHMENTS ON STRUCTURE
SP670 - CONCRETE PAVEMENT UNDERSEALING
SP759 - MISCELLANEOUS PORTLAND CEMENT CONCRETE STRUCTURES
SP965 - CAMERA POLES AND FOUNDATIONS
SP1030 - SEEDING
SP2050 - CURING MATERIALS
SP2910 - SIGN MATERIALS
 
OCTOBER 13, 2011 (08-04-11 update)
There are no boiler plate special provision updates for this bid opening.
 
OCTOBER 06, 2011 (07-28-11 update)
There are no boiler plate special provision updates for this bid opening.
 
SEPTEMBER 29, 2011 (07-21-11 update)
There are no boiler plate special provision updates for this bid opening.
 
SEPTEMBER 22, 2011 (07-14-11 update)
UPDATES TO BE INCLUDED IN SEPTEMBER 22, 2011 AND LATER PROJECTS:
SP280 - EROSION AND SEDIMENT CONTROL
SP406 - TUNNELING, BORING, AND JACKING
SP495 - TRENCH RESURFACING
SP501 - BRIDGE REMOVAL
SP512 - DRILLED SHAFTS
SP530 - STEEL REINFORCEMENT FOR CONCRETE
SP540 - STRUCTURAL CONCRETE
SP545 - REINFORCED CONCRETE BRIDGE END PANELS
SP550 - PRECAST PRESTRESSED CONCRETE MEMBERS
SP557 - PREMIXED POLYMER CONCRETE OVERLAYS
SP587 - BRIDGE RAILS
SP596A - MECHANICALLY STABILIZED EARTH RETAINING WALLS
SP596B - PREFABRICATED MODULAR RETAINING WALLS
SP641 - AGGREGATE SUBBASE, BASE, AND SHOULDERS
SP680 - STOCKPILED AGGREGATES
SP710 - SINGLE APPLICATION EMULSIFIED ASPHALT SURFACE TREATMENT
SP715 - MULTIPLE APPLICATION EMULSIFIED ASPHALT SURFACE TREATMENT
SP735 - EMULSIFIED ASPHALT CONCRETE PAVEMENT
SP744 - MINOR HOT MIXED ASPHALT CONCRETE (MHMAC) PAVEMENT
SP745 - HOT MIXED ASPHALT CONCRETE (HMAC)
SP748 - ASPHALT CONCRETE PAVEMENT REPAIR
SP749 - MISCELLANEOUS ASPHALT CONCRETE STRUCTURES
SP755 - CONTINUOUSLY REINFORCED CONCRETE PAVEMENT
SP756 - PLAIN CONCRETE PAVEMENT
SP759 - MISCELLANEOUS PORTLAND CEMENT CONCRETE STRUCTURES
SP1040 - PLANTING
SP1140 - POTABLE WATER PIPE AND FITTINGS
SP2630 - BASE AGGREGATE
SP2640 - SHOULDER AGGREGATE [NEW]
SP2690 - PCC AGGREGATE [NEW]
 
SEPTEMBER 08, 2011 (06-30-11 update)
There are no boiler plate special provision updates for this bid opening.
 
AUGUST 25, 2011 (06-16-11 update)
There are no boiler plate special provision updates for this bid opening.
 
AUGUST 18, 2011 [ADDITIONAL UPDATES] (06-09-11 update)
ADDITIONAL UPDATES TO BE INCLUDED IN AUGUST 18, 2011 AND LATER PROJECTS:
SP_TOC_FED - TABLE OF CONTENTS FOR FEDERAL FUNDED PROJECTS
SP_IN_GOAL - INDIAN GOALS AND COMPLIANCE FEE
SP180 - PROSECUTION AND PROGRESS
SP225 - WORK ZONE TRAFFIC CONTROL
SP250 - TEMPORARY DETOUR BRIDGES
SP252 - TEMPORARY WORK BRIDGES
SP280 - EROSION AND SEDIMENT CONTROL
SP320 - CLEARING AND GRUBBING
SP331 - SUBGRADE STABILIZATION
SP350 - GEOTEXTILES
SP555 - POST-TENSIONING
SP620 - COLD PLANE PAVEMENT REMOVAL
SP622 - GRINDING CONCRETE PAVEMENT [NEW]
SP745 - HOT MIXED ASPHALT CONCRETE (HMAC)
SP748 - ASPHALT CONCRETE PAVEMENT REPAIR
SP1030 - SEEDING
 
AUGUST 18, 2011 (05-26-11 update)
UPDATES TO BE INCLUDED IN AUGUST 18, 2011 AND LATER PROJECTS:
SP220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC
SP445 - SANITARY, STORM, CULVERT, SIPHON, AND IRRIGATION PIPE 
SP830 - IMPACT ATTENUATORS
SP2320 - GEOSYNTHETICS
SP2410 - CONCRETE AND PLASTIC PIPE
 
JULY 21, 2011 (05-12-11 update)
UPDATES TO BE INCLUDED IN JULY 21, 2011 AND LATER PROJECTS:
SP745 - HOT MIXED ASPHALT CONCRETE (HMAC)
 
JUNE 30, 2011 (04-20-11 update)
There are no boiler plate special provision updates for this bid opening.
 
JUNE 23, 2011 (04-13-11 update)
UPDATES TO BE INCLUDED IN JUNE 23, 2011 AND LATER PROJECTS:
SP235 - AGENCY PROVIDED MATERIAL SOURCES AND DISPOSAL SITES
SP555 - POST-TENSIONING
SP902 - CROSSWALK CLOSURE BARRICADES
 
JUNE 09, 2011 (03-31-11 update)
There are no boiler plate special provision updates for this bid opening.
 
JUNE 02, 2011 (03-23-11 update)
There are no boiler plate special provision updates for this bid opening.
 
MAY 19, 2011 (03-09-11 update)
UPDATES TO BE INCLUDED IN MAY 19, 2011 AND LATER PROJECTS:
SP480 - DRAINAGE CURBS
SP540 - STRUCTURAL CONCRETE
SP585 - EXPANSION JOINTS
SP597 - SOUND WALLS
SP755 - CONTINUOUSLY REINFORCED CONCRETE PAVEMENT
SP756 - PLAIN CONCRETE PAVEMENT
SP758 - REINFORCED CONCRETE PAVEMENT REPAIR
SP759 - MISCELLANEOUS PORTLAND CEMENT CONCRETE STRUCTURES
SP820 - CONCRETE BARRIER
SP2440 - JOINT MATERIALS [NEW]
SP2910 - SIGN MATERIALS
 
MAY 12, 2011 (03-03-11 update)
There are no boiler plate special provision updates for this bid opening.
 
MAY 05, 2011 (02-24-11 update)
There are no boiler plate special provision updates for this bid opening.
 
APRIL 28, 2011 (02-17-11 update)
UPDATES TO BE INCLUDED IN APRIL 28, 2011 AND LATER PROJECTS:
SP225 - WORK ZONE TRAFFIC CONTROL
SP280 - EROSION AND SEDIMENT CONTROL
SP557 - PREMIXED POLYMER CONCRETE OVERLAYS
SP596A - MECHANICALLY STABILIZED EARTH RETAINING WALLS
SP940 - SIGNS
SP2910 - SIGN MATERIALS
 
APRIL 21, 2011 (02-10-11 update)
There are no boiler plate special provision updates for this bid opening.
 
APRIL 14, 2011 (02-03-11 update)
There are no boiler plate special provision updates for this bid opening.
 
APRIL 07, 2011 (01-27-11 update)
UPDATES TO BE INCLUDED IN APRIL 07, 2011 AND LATER PROJECTS:
SP350 - GEOSYNTHETIC INSTALLATION
SP745 - HOT MIXED ASPHALT CONCRETE (HMAC)
SP2320 - GEOSYNTHETICS
 
MARCH 31, 2011 (01-27-11 update)
There are no boiler plate special provision updates for this bid opening.
 
MARCH 24, 2011 (01-13-11 update)
There are no boiler plate special provision updates for this bid opening.
 
MARCH 17, 2011 (01-06-11 update)
There are no boiler plate special provision updates for this bid opening.
 
MARCH 10, 2011 (12-22-10 update)
UPDATES TO BE INCLUDED IN MARCH 10, 2011 AND LATER PROJECTS:
SP_DBE - ASSIGNED DBE CONTRACT GOAL SHEET
SP245 - TEMPORARY WATER MANAGEMENT [NEW]
SP280 - EROSION AND SEDIMENT CONTROL
SP290 - ENVIRONMENTAL PROTECTION
SP396 - SHOTCRETE SLOPE STABILIZATION
SP445 - SANITARY, STORM, CULVERT, SIPHON, AND IRRIGATION PIPE
SP470 - MANHOLES, CATCH BASINS, AND INLETS
SP490 - WORK ON EXISTING SEWERS AND STRUCTURES
SP512 - DRILLED SHAFTS
SP530 - STEEL REINFORCEMENT FOR CONCRETE
SP535 - RESIN BONDED ANCHOR SYSTEMS
SP550 - PRECAST PRESTRESSED CONCRETE MEMBERS
SP745 - HOT MIXED ASPHALT CONCRETE (HMAC)
SP755 - CONTINUOUSLY REINFORCED CONCRETE PAVEMENT
SP758 - REINFORCED CONCRETE PAVEMENT REPAIR
SP759 - MISCELLANEOUS PORTLAND CEMENT CONCRETE STRUCTURES
SP820 - CONCRETE BARRIER
SP963 - SIGNAL SUPPORT DRILLED SHAFTS
SP1060 - METAL CATTLE GUARDS
SP2510 - REINFORCEMENT
 
FEBRUARY 24, 2011 (12-16-10 update)
There are no boiler plate special provision updates for this bid opening.
 
FEBRUARY 17, 2011 (12-09-10 update)
UPDATES TO BE INCLUDED IN FEBRUARY 17, 2011 AND LATER PROJECTS:
SP_COV_ARRA - SPECIAL PROVISIONS COVER PAGE FOR ARRA FUNDED PROJECTS [DELETED]
SP_SIG - SPECIAL PROVISION SIGNATURE SHEETS
SP_TOC_FED - TABLE OF CONTENTS FOR FEDERAL FUNDED PROJECTS
SP130 - AWARD AND EXECUTION OF CONTRACT
SP170 - LEGAL RELATIONS AND RESPONSIBILITIES
SP180 - PROSECUTION AND PROGRESS
SP225 - WORK ZONE TRAFFIC CONTROL
SP390 - RIPRAP PROTECTION
SP596B - PREFABRICATED MODULAR RETAINING WALLS
 
FEBRUARY 10, 2011 (12-02-10 update)
There are no boiler plate special provision updates for this bid opening.
 
FEBRUARY 03, 2011 (11-24-10 update)
There are no boiler plate special provision updates for this bid opening.
 
JANUARY 20, 2011 (11-10-10 update)
There are no boiler plate special provision updates for this bid opening.
 
JANUARY 13, 2011 (11-04-10 update)
UPDATES TO BE INCLUDED IN JANUARY 13, 2011 AND LATER PROJECTS:
SP225 - WORK ZONE TRAFFIC CONTROL
SP256 - TEMPORARY RETAINING WALLS
SP290 - ENVIRONMENTAL PROTECTION
SP396 - SHOTCRETE SLOPE STABILIZATION
SP440 - COMMERCIAL GRADE CONCRETE
SP559 - SILICA FUME AND LATEX MODIFIED CONCRETE OVERLAYS [NEW]
SP596A - MECHANICALLY STABILIZED EARTH RETAINING WALLS
SP596B - PREFABRICATED MODULAR RETAINING WALLS
SP755 - CONTINUOUSLY REINFORCED CONCRETE PAVEMENT
SP756 - PLAIN CONCRETE PAVEMENT
SP758 - REINFORCED CONCRETE PAVEMENT REPAIR
SP830 - IMPACT ATTENUATORS
SP2050 - CURING MATERIALS [NEW]
SP2320 - GEOSYNTHETICS

Page updated: February 02, 2012