Local Agency Guidelines Manual

What's Happening Now

The new (2014) Local Agency Guidelines Manual (LAG) Content Overview document reflects recent updates and chapters under revision.

Red = Needs Review

Yellow = Update in Progress

Green = Up to Date

 
Click image above to view the LAG Content Overview
Back to Top

Overview

The LAG Manual is updated as needed and the date of the most current chapter is recorded in the footer of the document.  Please refer to this website for the most current chapter.
   
As depicted within the Table of Contents, the LAG Manual is divided into three sections:
  • Section A -- Contains an introduction of certification and provides basic related information for local agencies
  • Section B -- Outlines project delivery information for non-certified local agencies, generally reflecting ODOT's current practices
  • Section C -- Depicts basic project delivery requirements for conditionally certified, or certified local agencies
 
Sections B and C are arranged chronologically, according to six phases of project delivery. Note, Phases II, III and IV are connected together as illustrated in the Table of Contents, because the activities within each of those three phases may overlap and extend into later phases. Refer to individual chapters for more details.

LAG Table of Contents (2014)

Foreword (2014)

Back to Top

Section A

INTRODUCTORY OVERVIEW
 
Title Page - (2014) 
 
Chapter 1 - Local Agency Guidelines Manual Introduction – Purpose and Organization (2012) 

Chapter 2 - Roles and Responsibilities of ODOT, FHWA and Local Agencies (2011) 
                  
Chapter 2 - Appendix – Approval Authority Matrix (2013) 

Chapter 3 - FHWA Funding Programs – Basic Procedures for Local Agency Participation (2011) 
 
Chapter 4 - Developing Projects Using the LAG Manual (2011) 
 
Chapter 5 - Local Agency Force Projects – Project Construction Requirements (2011)

Chapter 6 - Access Management (2011) 
 
Chapter 7 - Title VI Program (2014) 
   
 
Back to Top

Section B

NON-CERTIFIED LOCAL AGENCIES 
 
Chapter 1 - Introduction - The basics of delivering a Federally Funded Project (2014) 
 
Chapter 2 - Project Prospectus - Project in STIP (2011) 
 
Chapter 3 - Local Agency Agreement (2011) 
 
Chapter 4 - Progress Billings – Reimbursement Costs (2011) 
 
Chapter 5 - Environmental Process/Permits (2012) 
 
Chapter 6 – Right of Way Process (2011) 
 
Chapter 9 - General Design Requirements (2011) 
 
Chapter 10 - Design Approval (2011) 
 
Chapter 11 – Plans, Specifications and Estimates (PS&E) (2011) 
 
Chapter 12 - Consultant Selection (2011) 
 
Chapter 13 – Utility and Railroad Programs (2014) 
 
Chapter 14 - Bridge Selection, Scoping and Design (2011) 
 
Chapter 15 - State Advertising, Bid & Award Procedures (2011) 
 
Chapter 16 - Construction Contract Administration (2013)  
Back to Top

Section C

CERTIFIED LOCAL AGENCIES

 
Chapter 1 - Introduction – Certification Program Requirements, Processes and Benefits (2014) 
 
Chapter 2 - Becoming Certified (2014)

Chapter 2 - Appendix - Consultant Selection Evalution Form (2013)

Chapter 2 - Appendix - Exhibit A (2013)

Chapter 3 - Project Prospectus – Project in STIP (2011) 
 
Chapter 4 - Local Agency Agreement (2009) 
 
Chapter 5 - Progress Billings – Reimbursement Costs (2011) 
 
Chapter 5 -  Appendix - Desk Procedures (2009) 
 
Chapter 6 - Environmental Process/Permits (2013) 
 
Chapter 7 – Right of Way Process (2011) 
 
Chapter 8 - Civil Rights (DBE/EEO/OJT) (2014) 
 
Chapter 8 - Appendix 1- Civil Rights – Project Tracking Log (2014) 

Chapter 8 - Appendix 2 – Forms Matrix for Federal Projects (2014) 

Chapter 9 - General Design Requirements (2011) 
 
Chapter 10 - Design Approval (2011) 
 
Chapter 11 – Plans, Specifications and Estimates (PS&E) (2011)

Chapter 11 - Appendix 1- PS&E Delivery Checklist (2014)

Chapter 12 - Consultant Selection (2011) 
 
Chapter 12 - Appendix 1 – Architectural Engineering Services (2011) 
 
Chapter 12 - Appendix 2 – Non-Architectural Engineering Services (2011)
 
Chapter 12 - Appendix 3 - Consultant Selection Checklist (2011)  
 
Chapter 13 - Utility and Railroad Programs (2013)  
 
Chapter 14 - Bridge Selection, Scoping and Design (2011) 
 
Chapter 15 – Local Agency Advertising, Bid & Award Procedures (2014) 
 
Chapter 15 - Appendix - Local Advertising, Bid and Award Checklist (2013) 
 
Chapter 16 - Construction Contract Administration (2011) 
 
Chapter 16 - Appendix 1 - Construction and Contract Administration Checklist (2011) 
 
Chapter 17 - Project Closure (2011)

Chapter 18 - Certified Local Agency Oversight Plan (2011)

Chapter 19A - Desk Procedures: Progress Billings (2014

Chapter 19B - Desk Procedures: Master Certification Agreement (2011) 

Chapter 19C - Desk Procedures: Processing Supplemental Project Agreements (2011) 

Chapter 19D - Desk Procedures: Transitioning to Full Certification (2014)

Chapter 19D - Appendix - Process Map for transitioning to full certification (2014)


Back to Top

Section D

  
 
Chapter 1 - Acronyms   (2014)
Chapter 2 - Glossary (2014)