Text Size:   A+ A- A   •   Text Only
Find     
Forms & Publications
Forms
Industrial Rail Spur

Industrial Rail Spur Fund Application & Rules

Grade Crossings

Crossing Application
Appendix to Crossing Order Specification

Property Disposition
 
Public Real Property Near Rail Infrastructure Notification
 
 
 

Rail Employee Safety

Walkway Variance Application
Clearance Variance Application

Rail Right of Way Permit

Right of Way Permit Application

Railroad Annual Report
 
Railroad Annual Report

Publications
Rail Studies
 
2010
Oregon Rail Study
Book View Version (26.1 MB)
 Print Friendly Version (21.3 MB)
 Errata September 30, 2010 
Appendix A - Oregon Freight Rail System
 Appendix B - Oregon Rail Bridge Assessments, Report of Study Findings 
 Appendix C - Oregon Rail Tunnel Assessment 
 Appendix D - Oregon Rail Economic Trends 
 Appendix E - Oregon Commodity Flow Forecast 
 Appendix F - Portland to Eugene Intercity Passenger Rail Assessment 
 Appendix G - Eugene to Ashland Intercity Passenger Rail Assessment 
 Appendix H - Summary of Commuter Rail Studies Completed in Oregon Since 1997 
 Appendix I - Wilsonville to Salem Commuter Rail Assessment 
 Appendix J - State Ownership of Rail Assets 
 Appendix K - Rail Access & Land Use Considerations 
 Appendix L - Rail Industry Return on Investment Calculations 
 Appendix M - Rail Funding Options 
  
2010Pacific Coast Collaborative: High Speed Rail on the Pacific Coast 
 
2003
I-5 Rail Capacity Study 
 
 Appendices Index 
 Appendix A - I-5 Transportation and Trade Partnership Rail Capacity Analysis Committee Membership
 Appendix B - Findings and Recommendations of the I-5 Partnership Tas Force 
 Appendix C - Ten-Year Train Forcasts 
Appendix D - RTC Model Simulation Illustrations 
 Appendix E - Rail Capacity Improvement Concepts Recommended for the Next Five to Ten Years 
 Appendix F - Rail Capacity Improvement Concepts Beyond the Next Ten to Twenty Years
 Appendix G - Cost Estimate Worksheet 
  
2002
I-5 Corridor Final Strategic Plan 
  
2001
1986
Oregon Rail Plan Update 
1978
Oregon Rail Plan 
  
2000
PNWRC Oregon Segment Preliminary Environmental Anaylysis 
  
1994
Oregon High Speed Rail Business Plan 
  
1994
Oregon High Speed Rail Capacity Analysis 
 
1992
Oregon Passenger Policy and Plan 
  
1977
Willamette Valley Passenger Rail Study - Final Report 
 

Surveys
High-Speed Rail Survey
In 2010 the Oregon Department of Transportation Rail Division conducted a survey on high-speed rail. The objective of the survey was to provide the public with an opportunity to give feedback and offer suggestions to proposed DRAFT goals for improving Oregon’s passenger rail service between Eugene and Portland. These goals include improving on-time performance from 68 percent to 95 percent, increasing daily roundtrips from two to six, and reducing travel time from two hours and thirty-five minutes to two hours.
 
The results of the survey can be found at: High-Speed Rail Survey Results