Module 03.01 Capital Needs Assessment (CNA)
03.01-01 Overview
When a Capital Needs Assessment (CNA) is required by the department, the required CNA must, at a minimum, comply with the provisions of this Architectural Index module.
03.01-02 Purpose of the CNA and Department Expectations
Of the several important functions the CNA serves, one of its most critical functions is to provide an independent, neutral party assessment of the existing conditions of the site and its improvements from which a scope of work for the planned rehabilitation will be developed. Because the CNA plays a central role in rehabilitation projects, the department expects a high level of CNA provider neutrality and objectivity. CNA provider neutrality and objectivity is essential to the development of efficient, value driven scopes of work and budgets in keeping with the public’s and other project stakeholder expectations.
03.01-03 Owner Identification and Coordination of Stakeholder Users of the CNA
Multiple project stakeholders will likely require access and use of the project’s CNA making it critically important that all parties interested in the CNA be identified by the owner prior to engaging a CNA provider. Each interested party may have a number of unique requirements that will need to be satisfied by the CNA. Further, some interested parties may maintain an approved list of CNA providers that determine whose services and work products they will accept. Currently, the department does not maintain an Approved Provider List for CNA providers and requires only that the requirements of this
Appendix Section be complied with when CNAs are required by the department.
03.01-04 Importance of Early Project Owner/CNA Provider Contact and Engagement
Capital Needs Assessments are detailed, time intensive capital planning and risk assessment based analyses. The project owner is encouraged to make early contact with a qualified CNA provider to determine appropriate timing and coordination of the needed CNA with the CNA provider’s projected workload. When planning for the CNA it is particularly important to consider potential lead -time impacts due to surges in CNA requests that often coincide with cyclical funding deadlines established by the department and other entities that require CNAs in conjunction with their involvement in housing development and rehabilitation projects.
03.01-05 Baseline Standard
The department requires the CNA to be performed following ASTM E2018 -15;
Standard Guide for Property Condition Assessments protocols. The ASTM Standard may be exceeded as long as it remains satisfied by the approach taken.
Certain parts of these OHCS CNA Standards contain requirements that are supplemental to those defined in ASTM E2018 -15. If a conflict is identified between the ASTM standards and the requirements that are unique to OHCS, the more demanding or restrictive requirement is intended and shall be followed.
03.01-06 CNA Provider Qualifications
The CNA provider must comply with the following qualification standards:
-
CNA Provider Certifications: The CNA provider must possess a State of Oregon Architect license, a State of Oregon Professional Engineer license, or State of Oregon Commercial Construction Contractor license.
Exception: The department may, at its sole discretion, accept a provider who does not have one of the required credentials listed under this item provided their qualifications are otherwise deemed acceptable to the department and they have the experience required under item b) of this section. Department acceptance of a provider not meeting the criteria under item a) of this section must be in writing and must occur prior to the project owner’s engagement of the CNA provider. -
CNA Provider Experience: The CNA provider must have a minimum of 3 years of previous experience in Capital/Physical Needs Assessment which includes work on at least two projects of similar or greater size, scope, and complexity as the subject project.
-
CNA Provider Sub-Consultants: Specialized sub -consultants may be used to provide expertise on specific elements of the CNA. All CNA provider sub-consultant contributors must possess the qualifications required by the specific disciplines or work scopes described in these CNA requirements or if not specifically defined, then at a minimum, they must have performed similar services on at least two prior projects of similar size, scope and complexity as those proposed for the subject project. CNA contributors must have entered into a formal prime/sub-consultant contractual relationship with the principal provider for the proposed services.
-
Resume: The CNA must include a resume or brief professional biography for each of the major individual contributors (principal contributors) to the CNA including the principal provider and any sub-consultants tasked with providing specialized CNA related services. For each principal contributor, their resume or professional bio must list a minimum of two prior projects that are similar or greater in size, scope, and complexity to the subject project and in which professional services similar to those being proposed were rendered. The resume or professional bio must also, at a minimum, identify the number of years that the individuals have been performing the services they propose and must identify any pertinent and current licenses they hold including the license number, license expiration date, and the name of the license issuing authority as applicable.
-
Identity of Interest: The individuals providing CNA services, and their firms, must not have an identity of interest with the project owner, the owner’s property, or any management entity for the property and further must not provide other services (services outside the scope of the CNA, e.g. architectural design, construction, etc.) on the same project. If any pending litigation or claims exist against any of the involved firms or individuals related to their professional service (either as the primary consultant or as sub-consultant), these must be disclosed in writing to the project owner and to OHCS prior to engagement of services.
03.01-07 Format of the CNA Report
The CNA report can be organized as deemed most appropriate by the CNA provider but should follow standard industry practices.
03.01-08 Accepted Period of Validity
The CNA must have been originally performed or updated no more than 12 months prior to the submission deadline for the CNA report to the department. CNA reports that are not more than 12 months old from the original date of the report to the department’s deadline for receiving the report do not require updating. CNA reports that are older than 12 months at the time they are received by the department must be updated per section 03.01-09 CNA Updates of these requirements.
03.01-09 CNA Updates
- Updates to the CNA, when applicable per c) and d) below, must be performed by a CNA provider with the qualifications required by the section 03.01-06 CNA Provider Qualification section.
- When updated, the CNA must conspicuously identify that it is an update, it must clearly highlight any changes from the original report, and it must give the date of the update. Additionally, the update must address any new CNA requirements and/or any modifications to the CNA requirements that have taken effect since the CNA was originally prepared.
- CNA reports that are originally dated 24 months (730 days) or less prior to the date the report is issued to the department may be a desk-based update provided that maintenance and repair records have been carefully maintained since the time the original assessment was performed. Sufficiency of the records to qualify the CNA for a desk-based update as opposed to a full site review based update will be determined by the department.
Desk-Based Update: Means the assessment does not necessarily require a physical visit to the site, if, in the CNA providers opinion, reasonable assumptions can be drawn from conversations, review of documents, etc. that can occur remotely. - CNAs that are originally dated more than 24 months (730 days) from the date they will be issued to the department must be updated based on a full site-based review of the property. In such cases, the degree of site review needed for the update will be determined by the department with the CNA provider’s input. At a minimum, the site-based update must be of sufficient depth and detail to accurately reflect actual current conditions and current replacement reserve needs.
03.01-10 Element and Systems Descriptions and Conditions
The CNA report must include a section dedicated to describing the basic characteristics and current condition of the site and building elements and systems. This section of the CNA report must be based on and/or include the following:
-
Scope of Review: The CNA must be comprehensive in scope including, but not necessarily limited to, the assessment of the site, site amenities, building envelope, structural system, foundation, electrical/plumbing/HVAC systems, interior finishes and elements, elevators, egress components, fire protection systems, other elements and systems as applicable and appropriate to the unique physical characteristics of each project.
-
Extent of Access and Inspection: Except for dwelling unit interiors as noted in the exception below, 100% of the building(s) including all interior and exterior spaces to be acquired and/or rehabilitated and all areas of the site must be inspected and included in the CNA. If an area of the building(s) or site cannot be inspected at the time of the scheduled inspection, the CNA must include an explanation for why the areas were not investigated and a rationale given for any assumptions that may be made in the CNA Report regarding the condition of the uninspected areas. The department may, at its sole discretion, require that the uninspected areas be inspected prior to accepting the CNA as being complete. A brief summary that describes the areas that were not observed as part of the building and site inspection must be provided.
Exception (Dwelling Unit Interiors Only): Inspection of
dwelling unit interiors may be limited to
no less than 33%
of the total number of dwelling units within each building however no fewer than three units will be inspected in buildings containing four to nine units and 100% of the dwelling unit interiors will be inspected in buildings containing three or fewer dwelling units. The inspection of dwelling unit interiors should be divided evenly among all the dwelling unit types present. Care should be taken to ensure the dwelling unit sampling size as required by this section is sufficient to satisfy all stakeholder users of the CNA. -
Interviews: Individuals familiar with the site and buildings must be interviewed as part of the CNA. At least two individuals must be interviewed who maintain one or more of the following roles or responsibilities related to the subject property:
- Owner
- Property Manager
- Maintenance Lead
- Other (In possession of significant and pertinent knowledge of the property)
- All interviews conducted must be documented in the CNA and must include the individual’s name, their position/relationship to the property, and the general nature of the information discussed.
-
Document Review: Documents fundamental to developing a sound understanding of the site and buildings must be requested and reviewed when available as part of the CNA. The ASTM Standard referenced in section 03.01-05 Baseline Standard this module lists the documents that should be reviewed. Documents recommended for review as listed in the ASTM E2018 -15 standard that are not available for review must be disclosed in the document review section of the CNA report.
-
Pre-Survey Questionnaire: The CNA provider’s pre-survey questionnaire must be completed by the property owner or their designated representative, and the completed questionnaire must be included in the CNA report.
-
Total Expected Service Life: The CNA must include an estimate of the total expected service life of each of the building and site elements and systems identified.
-
Remaining Useful Life: The CNA must include an estimate of the remaining useful life of each of the building and site elements and systems identified.
-
Condition Rating System: The CNA may use any component grading system deemed appropriate by the CNA provider to describe the condition of the elements and systems identified.
03.01-11 Specific Areas of Interest to OHCS
The specific areas of interest listed below must be addressed by the CNA. Specialized sub-consultants to the project owner’s prime CNA consultant may be necessary to provide the needed general assessment in the areas of focused interest listed below.
-
Energy and Water Use Assessment: If the subject building(s) are 15 years or older in age (taken from the date of the architect’s certificate of substantial completion) the CNA must include an energy and water use assessment as defined in this section. The following minimum requirements apply:
- Energy and water use assessments must be performed by an energy consultant possessing a minimum of three years of experience conducting multifamily housing energy assessment/audits and must have personally conducted energy assessments/audits on at least two prior projects of equal or greater size and complexity as the subject property. A resume per section 03.01-05 Baseline Standard demonstrating that the consultant meets department experience requirements must be included in the CNA.
- The assessment report must disclose any potential conflicts of interest of the
assessment provider or their firm with the project or any member of the owner’s project team. - The assessment must include interviews with the owner, property manager(s), and maintenance staff about their knowledge or awareness of energy and water efficiency related deficiencies and any indoor air quality issues. A written synopsis of any pertinent information gathered must be included in the assessment report.
- Extent of Access and Inspection: Refer to section 03.01-10 Element and Systems Descriptions and Conditions for requirements.
- At a minimum, the assessment report must describe the general character and condition of the elements listed below relative to their impact on energy and water use efficiency. For each item listed include recommendations for corrective work or element/system upgrades or replacement as deemed appropriate. Where possible, provide a hierarchical rating of the proposed improvements in order of the magnitude of their positive impact on energy/water efficiency or quality of life of the occupants.
- Combustion appliances
- Indoor air quality and ventilation systems. Include cfm ratings for all kitchen and bathroom exhaust systems in units assessed. Test and describe functionality of clothes dryer venting in all assessed units and in common laundry areas.
- Building envelope including, but not limited to, doors, windows, condition of weather resistive barrier (WRB) when visible, insulation type, condition, and R-values for wall, attic, and below floor insulation.
- Domestic hot water system
- Heating and cooling systems
- Lighting in all assessed dwelling units, all common areas, and all outdoor lighting
- Water use fixtures in all assessed units and all common areas
- Provide a general visual based assessment of the outdoor water use e.g. high/low summer-time irrigation demand, pools, fountains, etc. Generally, describe the apparent efficiency/functionality of the irrigation system, if present.
- Appliances
- Other equipment as applicable to the subject property.
-
Exception: A waiver of some or all of the energy and water use assessment requirement may be granted by the department when the project constitutes a Change of Use as this term is defined by the Oregon Structural Specialty Code, and where the finished project will meet or exceed current Oregon Energy Code requirements for new construction as well as any OHCS sustainable design requirements. In such cases, the project owner must submit a Variance Request (OAS Form VR which can be obtained in the project WorkCenter) justifying a waiver of the energy and water use assessment/audit. If approved, the department approved Form VR must be included in the CNA.
-
Important note regarding energy and water use assessments: Funding programs such as the department’s Multifamily Energy Program (OR-MEP) may have specific energy audit requirements that are additional to or may be different from the CNA requirements given in this document. Project’s receiving MEP funding must verify current energy audit requirements for the program to ensure prog ram compliance is maintained. Should a conflict in the department energy audit requirement for a given project occur, the more restrictive of the conflicting requirements will control.
-
Accessibility: The CNA must provide a summary analysis of the property’s accessibility that, at a minimum, addresses the following:
- A review and assessment of the property for accessibility compliance and the development of a list in the assessment of any deficiencies observed.
- Identification of areas and/or primary building components that have or appear to have received significant prior accessibility updates and the approximate date that the updates occurred.
- Identification of any documented history (or the lack of any history) related to past or current accessibility related complaints or concerns.
- Identification of any limitations of the assessment.
-
Environmental Hazards – General: The CNA must include any observed conditions and/or any related pertinent information gleaned from readily available documentation/reports related to environmental hazards including but not necessarily limited to:
- Evidence of the existence of lead pipes and/or lead-based coatings.
- Evidence of the existence of asbestos.
- Evidence of excessive levels of mold or evidence of mold conducive conditions.
- Evidence of rodent Infestation.
- Any other observed environmental hazard-related issue e.g. presence of fuel tanks, fuel leaks, septic system malfunction, etc.
- Provide a list of needed/recommended environmental hazard related upgrades in order of importance.
-
Environmental Hazards - Radon: The CNA must include the following with respect to radon:
- The CNA must summarize any observed conditions and/or any related pertinent
information gleaned from readily available documentation/reports related to the
potential presence of Radon at the site. - The CNA must include testing for radon when the site is in a zone showing moderate to high levels of radon presence. The department uses the Oregon Health Authority’s (OHA) Online/Interactive
Map of Radon Risk Levels in Oregon to determine moderate to high risk areas. The following standards related to radon testing must be met:
- When testing is required: Areas of the above-mentioned OHA map shaded in light yellow, yellow, pink, and red are considered to be moderate to high level areas; projects located in these areas must receive testing.
Exception: Radon testing may be waived at the department’s discretion in cases where a radon professional (per item iv below) concludes that neither testing nor mitigation is necessary based on a physical inspection of the property, the characteristics of the buildings, and other valid justifications. An example of a valid justification is having only a garage located at grade level that is open to the air or is fully ventilated.
Waiver requests should use
OAS Form VR which can be obtained in the project owner’s WorkCenter. The waiver request must include a written signed statement/rational by the radon professional supporting the request. If approved, the department approved Form VR must be included in CNA. -
Report: The radon test must include a report that summarizes the testing protocol undertaken, the results of the test, and the details of any mitigation deemed by the radon professional to be prudent or necessary.
-
Buildings to be tested: All buildings containing spaces used by residents and/or residential operations staff must be tested.
-
Test protocol: Radon testing must follow the protocols set by the American Association of Radon Scientists and Technologists, Protocol for Conducting Radon and Radon Decay Product Measurements in Multifamily Buildings (ANSIAARST MAMF -2017 (or the most recent edition).
-
Radon professional: All testing and mitigation must be performed under the supervision of a radon professional that is certified by either the American Association of Radon Scientists and Technologists (AARST) National Radon Proficiency Program (NRPP) or the National Radon Safety Board (NRSB).
-
Natural Hazards – General: The CNA must include any observed natural hazards related conditions as follows:
- Evidence of previous and/or risk of future impacts of flooding, landslide, high wind, wildfire or other natural hazard based on readily observable conditions and/or available documents/reports.
- Provide a list of needed/recommended natural hazard related upgrades in order of importance.
-
Natural Hazards – Seismic Risk: The CNA must include a narrative risk assessment or mitigation strategy that, at a minimum, includes the following elements:
- A list of identified seismic risks including structural deficiencies based on the structure’s age and construction type.
- Any code required upgrades e.g. those that may be driven by a ‘Change of Occupancy’ or other drivers.
- A list of suggested upgrades in order of priority with an estimate of associated costs to remedy.
-
Recommendation for additional professional assessment: The CNA must identify where the CNA provider feels more specialized professional assessment is needed or recommended particularly with respect to items c) through f) of this section.
03.01-12 Specialized Focused Inspections
- Building envelope inspection: Some projects are required to provide a specialized building envelope inspection conducted in accordance with Architectural Index Module 03.03 – Building Envelope Inspection. This specialized inspection, when required, can be integrated into the CNA or it can be provided as a separate report.
When a specialized building envelope inspection is required by the department, this requirement is conveyed to the project owner via their OHCS project specific WorkCenter.
CNA providers should confirm with their client if the specialized building envelope inspection is required and if so whether the CN A will be tasked with addressing the requirement.
03.01-13 Opinion of Costs to Remedy Physical Deficiencies
The CNA must provide a list of needs with associated costs to remedy broken into the three needs categories given below. Costs given must include current market rate values for materials, labor, and construction contractor profit and overhead.
-
Imminent health and safety needs: The CNA must identify all observed conditions which can be considered an imminent threat to occupant health and safety.
Note: If serious health and safety issues are identified in currently occupied buildings, the department may require that all such issues be temporarily or permanently addressed to the department’s satisfaction prior to offering any conditional award of program funding. -
Critical needs: The CNA must identify all physical needs requiring attention within a 24-month period from the date of the CNA report.
-
Non-critical needs: The CNA must identify all physical needs requiring attention beyond the critical needs window identified in item b) above, and extended out to at least 20 years. Needs in this category must be provided in a schedule type format.
03.01-14 Projected Post Project Completion Analysis of Reserves for Replacement
(Also referred to in this document as a “Capital Plan”)
As a later follow -up submission requirement connected with the CNA, the project owner will be required to obtain from their CNA provider and submit to the department
a Projected Post Construction Reserves for Replacement Analysis (RFR). This analysis will be due to the department later in the funding application process after the project scope has been conclusively determined. The CNA provider will use the finalized scope of work for the project to develop the RFR. This follow-up requirement to the CNA must be factored into the project owner’s scope of services agreement with their CNA provider when they procure CNA services for a given project.
The RFR must include an estimate of the initial and ongoing monthly deposit into the replacement reserve needed to support the capital needs of the project for a minimum period of 20 years.
The projected Post Project Completion RFR Analysis
must not include items that fall into one of the three operations related areas listed below. Costs associated with the three operations related areas listed below must be addressed using project operating funds taken from the completed projects operating budget - not from funds reserved for post project completion capital needs.
- Maintenance
- Repair
- Unit turnover
03.01-14 Photographic Record
The CNA must include color photographs of sufficient detail and extent to adequately record the character and condition of the property.
03.01-15 Other OHCS Requirements
-
CNA scope of services and fee proposal to project owner
The CNA must include the scope of service proposal to the project owner including the Fee being charged to the owner by the CNA provider. Additionally, the fee must show line-item figures for any specialized sub -consultant contributor’s i.e.:, Energy and Water Use Audit, etc. The department uses this data to stay appraised of industry cost expectations for these services. -
Acknowledgement of compliance with CNA requirements
The CNA must include a statement by the principal provider within the executive summary that indicates that the completed CNA complies with these OHCS CNA requirements. If an aspect of the department CNA requirements cannot be fully complied with, the required acknowledgement must identify what requirements have not been fully addressed and must include a detailed rationale for the omission or deviation. Omissions of or material deviations in meeting the requirements of these standards must be approved by the department in writing for the CNA to be considered complete. Timing of such requests should be made well in advance of the projected submittal date to the department so that there is adequate time for the CNA to be revised by the applicant’s CNA provider if deemed necessary by the department.
03.01-16 Small Project CNA
Projects consisting of four (4) or fewer contiguous dwelling units (Small Projects) may elect to have a CNA performed under the requirements of this section as follows:
- The CNA, the inspector, and the inspector’s report must address all the same conditions stipulated for the standard CNA with the following modifications:
- Section 03.01-06 CNA Provider Qualifications, a) is modified to include an individual in possession of a current Oregon Home Inspector’s license. An individual in possession of a current Oregon Home Inspector’s license.
- Section 03.01-06 CNA Provider Qualifications, e) is modified to remove the project architect as an entity not
eligible to perform the needed services. - Exceptions: The following sections do not apply to the Small Project CNAs: Section 03.01 -10; c), d), e) Element and Systems Descriptions and Conditions Section 03.01 -11; a) Specific Areas of Interest to OHCS Section 03.01 -14 Projected Post Project Completion Analysis of Reserves for Replacement
- It is suggested that the narrative section of the inspector’s report be developed such that it follows the same sequence as that given in these requirements. The inspector is expected to address each required item only to the extent it can be reasonably done with visual inspection of the property. In some cases, the ability to address one or more of the requirements of this section will be limited or may not be possible. Where a required item is deemed by the Inspector to be unachievable or outside the reasonable scope of the inspection, the Inspector may address the requirement by stating in their report the rationale for why the requirement could not be addressed. The overarching goal of the
Small Project CNA is to acquire and convey as much critical rehabilitation scope defining information as possible within a limited investigatory process. As long as the spirit of this goal is reflected in the inspector ’s work product, the department will allow the inspector wide latitude in how closely the inspection scope and report meets the requirements of this section. The department may require additional investigation based on the content of the submitted Small Project CNA. The department will reject work products it deems to have not meet the spirit and intent of this section.
03.0 1-17 Partial Exemptions from CNA Requirements
The department may grant a partial exemption from the CNA requirements for projects that meet the definition of a Substantial Rehabilitation where the hard cost to rehabilitate is 75% or greater than the hard cost to reconstruct completely.
A completed Form VR, located in the project owner’s WorkCenter, must be submitted to the department at the earliest possible date if a variance from the CNA requirements is deemed appropriate or necessary by the project owner. The following documentation must accompany the variance request:
- A brief written description of the project.
- A rehab vs. complete-rebuild cost analysis deemed acceptable to the department supporting the contention that the project meets the definition of a Substantial Rehabilitation.
- A proposal following the numbered format of the CNA requirements that indicates which major elements of these requirements will be provided in the proposed reduced-scope CNA and which ones are proposed to be excluded. A brief rationale must be provided for each item that is proposed to be excluded.
When reduced -scope CNAs are submitted to the department, they must include the department approved Form VR and the documentation listed in items a) through c) above to be considered complete.
Module reference: HUD’s Office of Multifamily Development Radon Policy