Boardman to Hemingway Transmission Line

Facility Details
Status details
Location description
  
  
  
The Boardman to Hemingway Transmission Line is an approximately 270.8-mile-long single-circuit 500-kV electric transmission line that crosses five counties in Oregon, Morrow, Umatilla, Union, Baker, and Malheur counties. The facility includes roads, communication stations, the Longhorn Station, and temporary construction areas.
Approved/Under Construction. Facility construction in Malheur County commenced in June 2025, in areas where the Department concurred that applicable preconstruction requirements had been satisfied. Preconstruction compliance is ongoing. Once preconstruction compliance concurrence is obtained from the Department for remaining work areas, construction is forecasted to continue through 2027. 

On March 6 and 8, 2026, the Oregon Department of Energy (Department) received Amendment Determination Requests (ADR-002 and ADR-006), pursuant to OAR 345-027-0357(3), from Idaho Power Company.​

  • ADR-002: Seeks Department review and concurrence of whether expansion of temporary access road widths from 60 to 100 feet requires review through the amendment process. The change is requested to allow a safer workspace while helping to prevent erosion and sediment from leaving the work area. The increase in disturbance equates to 31.1 acres. The proposed changes are within the site boundary but outside of the approved micrositing corridor. 
  • ADR-006: Seeks Department review and concurrence of whether the addition of 4.26 miles of access road and shifting of a pulling and tensioning site location requires review through the amendment process. These changes are a result of landowner coordination/requests while also providing safe construction conditions. The proposed changes are within the site boundary but outside of the approved micrositing corridor. 

The ADRs are available in the “Project Timeline" below, and will be announced at the April 17, 2026 Council meeting. Following review of the ADRs, the Department will issue a written determination confirming whether the changes need to be reviewed through the Council's amendment process. The determination will be posted to the webpage and announced at a Council meeting.

Idaho Power CompanySarah EstersonJoe Stippel

Project Timeline

  
Additional Documents
  
  
  
  
<div style='text-align:left !important'>Notice of Intent</div>
07/15/2010Notice of IntentNotice of Intent
<div style='text-align:left !important'>Second Amended Project Order</div>
07/26/2018Second Amended Project OrderSecond Amended Project Order
<div style='text-align:left !important'>Complete Application (Large files)</div>
Contents of the Application

Exhibit B (Main)
Exhibit B (Attachments B1-B4)
Exhibit B (Attachments B5 Part 1)
Exhibit B (Attachments B5 Part 2)
Exhibit B (Attachments B6-B7a)
Exhibit B​ (Attachments B7b)
Exhibit H (Part 1)
Exhibit H (Part 2)
Exhibit I (Part 1)
Exhibit I (Part 2)
Exhibit J (Main Part 1)
Exhibit J​ (Main Part 2)
Exhib​it J (Main Part 3)
Exhibit J (JPA Part 1)
Exhibit J (JPA Part 2)
Exhibit J​ (JPA Part 3)
Exhibit J​ (JPA Part 4)
Exhibit J (Wetland Delineation Part 1)
Exhibit J​ (Wetland Delineation Part 2)
Exhibit J (Wetland Delineation Part 3)
Exhibit J (Wetland Delineation Part 4)
Exhibit J (Wetland Delineation Part 5) 
Exhibit J (Wetland Delineation Part 6)
Exhibit N (Part 1)
Exhibit N​ (Part 2)
Exhibit P1 (Part 1 Main to Attachment P1-6)
Exhibit P1 (Part 2a Attachment P1-7A)
Exhibit P1 (Part 2b Attachment P1-7A)
Exhibit P1 (Part 3 Attachment P1-7B)
Exhibit P1 (Part 4a Attachment P1-8)
Exhibit P1 (Part 4b Attachment P1-8)
Exhibit P1 (Part 5 Attachment P1-9)
Exhibit P2 (GRSG)
Exhibit P3 (Elk)
09/28/2018Complete Application (Large files)Complete Application (Large files)
<div style='text-align:left !important'>Additions to Complete Application</div>03/28/2019Additions to Complete ApplicationAdditions to Complete Application
<div style='text-align:left !important'><a href='/energy/facilities/Facilities%20library/2022-09-27-Final-Order-on-ASC.pdf'>Final Order</a></div>09/27/2022/energy/facilities/Facilities%20library/2022-09-27-Final-Order-on-ASC.pdfFinal OrderFinal Order
<div style='text-align:left !important'><a href='/energy/facilities/Facilities%20library/2023-06-08-B2H-AMD1-RFA1.pdf'>Complete Request For Amendment 1 (RFA1)</a></div>06/08/2023/energy/facilities/Facilities%20library/2023-06-08-B2H-AMD1-RFA1.pdfComplete Request For Amendment 1 (RFA1)Complete Request For Amendment 1 (RFA1)
<div style='text-align:left !important'><a href='/energy/facilities/Facilities%20library/2023-09-22-B2HAMD1-Final-Order-2023-09-22_Signed.pdf'>Final Order on RFA1</a></div>09/22/2023/energy/facilities/Facilities%20library/2023-09-22-B2HAMD1-Final-Order-2023-09-22_Signed.pdfFinal Order on RFA1Final Order on RFA1
<div style='text-align:left !important'><a href='/energy/facilities/Facilities%20library/2023-09-22-B2HAMD1-Attachment-1-First-Amended-Site-Certificate-Executed.pdf'>First Amended Site Certificate</a></div>
09/22/2023/energy/facilities/Facilities%20library/2023-09-22-B2HAMD1-Attachment-1-First-Amended-Site-Certificate-Executed.pdfFirst Amended Site CertificateFirst Amended Site Certificate
<div style='text-align:left !important'><a href='/energy/facilities/Facilities%20library/2014-04-11-B2H-RFA2-Main.pdf'>Request for Amendment 2 (RFA2)</a></div>04/11/2024/energy/facilities/Facilities%20library/2014-04-11-B2H-RFA2-Main.pdfRequest for Amendment 2 (RFA2)Request for Amendment 2 (RFA2)
<div style='text-align:left !important'><a href='/energy/facilities/Facilities%20library/2024-08-23-B2HAMD2-Final-Order.pdf'>Final Order on RFA2</a></div>08/23/2024/energy/facilities/Facilities%20library/2024-08-23-B2HAMD2-Final-Order.pdfFinal Order on RFA2Final Order on RFA2
<div style='text-align:left !important'><a href='/energy/facilities/Facilities%20library/2024-08-23-B2HAMD2-Attachment-1-Second-Amended-Site-Certificate.pdf'>Second Amended Site Certificate</a></div>
08/23/2024/energy/facilities/Facilities%20library/2024-08-23-B2HAMD2-Attachment-1-Second-Amended-Site-Certificate.pdfSecond Amended Site CertificateSecond Amended Site Certificate
<div style='text-align:left !important'><a href='/energy/facilities/Facilities%20library/2025-12-12-B2H-ADR.pdf'>Amendment Determination Request (ADR 004)</a></div>12/12/2025/energy/facilities/Facilities%20library/2025-12-12-B2H-ADR.pdfAmendment Determination Request (ADR 004)Amendment Determination Request (ADR 004)
<div style='text-align:left !important'><a href='/energy/facilities/Facilities%20library/2026-03-27-B2HOPS-ODOE-Determination-on-ADR004.pdf'>Department Determination on ADR 004</a></div>
03/27/2026/energy/facilities/Facilities%20library/2026-03-27-B2HOPS-ODOE-Determination-on-ADR004.pdfDepartment Determination on ADR 004Department Determination on ADR 004
<div style='text-align:left !important'><a href='https://stage-auth.oregon.gov/energy/facilities/Facilities%20library/2026-04-06-B2H-ADR-002.pdf'>Amendment Determination Request (ADR 002) </a></div>
04/06/2026https://stage-auth.oregon.gov/energy/facilities/Facilities%20library/2026-04-06-B2H-ADR-002.pdfAmendment Determination Request (ADR 002) Amendment Determination Request (ADR 002)
<div style='text-align:left !important'><a href='https://stage-auth.oregon.gov/energy/facilities/Facilities%20library/2026-04-08-B2H-ADR-006.pdf'>Amendment Determination Request (ADR 006)</a></div>
04/08/2026https://stage-auth.oregon.gov/energy/facilities/Facilities%20library/2026-04-08-B2H-ADR-006.pdfAmendment Determination Request (ADR 006)Amendment Determination Request (ADR 006)
B2H Record and Selected Contested Case Files

(One Drive)