Skip to main content

Oregon State Flag An official website of the State of Oregon »

Rogue River Basin Total Maximum Daily Load

Proposed rule

Rulemaking contact: Michele Martin, 503-880-7737

In 2013, the United States Environmental Protection Agency disapproved the Natural Conditions Criterion contained in Oregon's water quality standard for temperature due to the 2012 U.S. District Court decision for NWEA v. EPA, 855 F. Supp. 2d 1199 (D. Or., 2012). This portion of the temperature water quality standard was used in most temperature Total Maximum Daily Loads issued from 2003 through 2012. On Oct. 4, 2019, the U.S. District Court issued a judgment for NWEA v. EPA, No. 3:12-cv-01751-HZ (D. Or., Oct. 4, 2019) and required DEQ and USEPA to replace 15 Oregon temperature TMDLs that were based on the Natural Conditions Criterion and to reissue the temperature TMDLs based on the remaining elements of the temperature water quality standard.

A TMDL is a water quality restoration plan and the calculation of the maximum amount of a pollutant that a waterbody can receive while still meeting water quality standards for that particular pollutant. The maximum amount of loading a waterbody can receive is called the loading capacity. Loading from all pollutant sources must not exceed the loading capacity of a waterbody, including an appropriate margin of safety.

The temperature TMDLs for the Rogue River Basin will be developed to addresses temperature listings. The exact extents are described in the Quality Assurance Projects Plans listed on the Temperature TMDL Replacement Rogue River Basin project page. The TMDL phasing considers the extent of the water quality models being used to support the TMDLs, requirements of the court order, and DEQ's available resources.

Advisory committee

DEQ is convening an advisory committee to review the technical issues and fiscal impacts related to the proposed rules. In convening this committee, DEQ has appointed members that reflect the range of entities that are both directly and indirectly affected by proposed changes to the rules.

Meeting 1: Feb. 26, 2026, 10 a.m. to 12 p.m. PT

Location: Rogue Valley Council of Governments
155 1st Street
Central Point OR 97502

  • Join Zoom Meeting 

  • Join by phone:
    877-853-5257 US Toll-free 
    Meeting ID: 842 0024 0869​


Meeting 2: May 21, 2026 10 a.m. to 12 p.m. PT

Location: Rogue Valley Council of Governments
155 1st Street
Central Point OR 97502

  • Join Zoom Meeting 

  • Join by phone:
    877-853-5257 US Toll-free 
    Meeting ID: 852 7113 6750​




Public involvement

Informational Meeting: Feb. 12, 2026, 1 p.m. to 3 p.m. PT

The agenda includes a presentation about the draft Total Maximum Daily Load and the Water Quality Management Plan.

This meeting will be held in-person at the Rogue Valley Council of Governments as well as via Zoom.

Rogue Valley Council of Governments
155 N 1st Street
Central Point, OR 97502

Join via Zoom
Join by phone:
877-853-5257 US Toll-free
Meeting ID: 868 3351 6212

GovDelivery sign up Sign up for email or text updates on this rulemaking via GovDelivery.

EQC action

DEQ plans on presenting the Rouge River Basin TMDL to the Environmental Quality Commission for proposed rule adoption in July 2027 to give EPA a minimum of 30 days for their approval or disapproval by Oct. 18, 2027.