Pacificorp (applicant) proposes to construct and operate the Sunrise Solar and Storage Projects (facility), a photovoltaic solar energy generation facility paired with a battery energy storage system (BESS), located in unincorporated Morrow County, Oregon. The proposed facility would consist of solar arrays with up to 800 megawatts (MW) of solar generation and a BESS with up to 800 MW of energy storage capacity, and related or supporting facilities including inverters, transformers, a 34.5 kilovolt (kV) collection system, Operations and Maintenance building, one or more 230 kV generation-tie lines, facility service and access roads, perimeter fencing, and temporary construction areas. The applicant also proposes a new collector substation to step up and interconnect the facility to the future Boardman to Hemingway 500-kV transmission line to be located in Morrow County, northeast of the site boundary. The proposed site boundary encompasses 6,981 acres of privately-owned, exclusive farm use zoned land, northeast of Ione in Morrow County.

Under Review/Proposed. On February 27, 2025, the Oregon Department of Energy (ODOE or Department) received a Notice of Intent to File an Application for a Site Certificate (NOI) for the Sunrise Solar and Storage Projects (facility). 

The Department issued a Public Notice of the NOI and opened a public comment period on the NOI on March 26, 2025. The Public Notice is available in the Project Timeline below.

A Public Informational Meeting was held at the Port of Morrow in Boardman on April 24, 2025 and virtually via webinar. A copy of the presentation and a recording of the Public Meeting are available below:

Comments submitted through the comment portal and copies of public written comments received during the public comment period are available for view on the Siting Docket. On July 8, 2025, the Department issued a Project Order establishing the statutes, administrative rules, Council standards, local ordinances, and other requirements for the site certificate application. The applicant anticipates submitting a preliminary Application for Site Certificate in Q1 2026. The NOI and Project Order will expire on February 27, 2027, unless an extension is granted by Council.

Copies of the Notice of Intent, Public Notice, and Project Order are available below.​

​Morrow County, approximately 1 mile northeast of Ione. 

PDF Map​ I Online Map​

Applicant/Certificate holder: Pacificorp, a wholly-owned subsidiary of Berkshire Hathaway Energy Company.
ODOE contact: Kathleen Sloan
Applicant/Certificate holder contact: Jeffrey Wagner

​​​​

Project Timeline

  
Additional Documents
  
02/27/2025
03/26/2025
07/08/2025

​​

​​
​Contact the Facility Siting Team:
​​​​​​​​​​​​​​​

Exhibit Files Reference

  • Exhibit A: Applicant Information 
  • Exhibit B: Project Description
  • Exhibit C: Property Location and Maps
  • Exhibit D: Organizational Information
  • Exhibit E​: Permits Required
  • Exhibit F: Property Ownership 
  • Exhibit G: Materials Analysis
  • Exhibit H: Geology and Soil Stability 
  • Exhibit I: Soils
  • Exhibit J: Wetlands
  • Exhibit K: Land Use
  • Exhibit L: Protected Areas
  • Exhibit M: Financial Analysis
  • Exhibit N​: Non-generating Facility Information
  • Exhibit O: Water Requirements
  • Exhibit P: Fish Wildlife Habitat 
  • Exhibit Q: Threatened and Endangered Plants and Animals
  • Exhibit R: Scenic Aesthetic Values 
  • Exhibit S: Cultural Resources
  • Exhibit T: Recreational Facilities 
  • Exhibit U: Public Services
  • Exhibit V​: Waste Minimization 
  • Exhibit W: Site Restoration
  • Exhibit X: Noise 
  • Exhibit Y: Carbon Dioxide Emissions 
  • Exhibit Z: Cooling Towers  
  • Exhibit AA: EMFs – Electric and Magnetic Fields
  • Exhibit BB: Other Information
  • Exhibit CC: Additional Statutes Rules Ordinances
  • Exhibit DD​: Other Specific Standards