Saddle Butte Energy Facility is a proposed 488-megawatt (MW) wind power generation facility, with related or supporting facilities including a 488 MW battery energy storage system. The proposed site includes approximately 11,500 acres of privately owned land zoned Exclusive Farm Use in Gilliam County.

Under Review/Proposed. On December 12, 2025, the Oregon Department of Energy (Department) received a Notice of Intent (NOI) to file an Application for a Site Certificate (ASC) for Saddle Butte Energy Facility (proposed facility).  Public Notice of the NOI, Public Comment Period,  and Public Informational Meeting was issued on December 30, 2025. The Public Notice opened the Public Comment Period on the NOI. Details on how to submit comments and participate in the Public Informational Meeting are included in the Public Notice in the timeline below. The Notice of Intent is also available below.

A Public Comment Period on the NOI is now open and will extend until January 30, 2026 at 5:00 p.m. Pacific Time (PT). Comments may be submitted in writing via mail, fax, email, or through our siting comment portal. To submit comments through the comment portal follow the link below and select “Speedway Energy Facility" from the dropdown menu and follow prompts:

An in-person and remote Public Informational Meeting on the NOI was held in Condon, Oregon on January 13, 2026.  At this meeting, the Department and the applicant presented information about the Siting Process (how to participate and comment) and the proposed facility and location, respectively. The materials presented and a recording of the meeting are available below: 


​Gilliam County, approximately 6 miles southwest of the city of Arlington. PD​F Map​  | Online Map

Applicant/Certificate holder: Saddle Butte Wind, LLC a subsidiary of Brookfield Renewable N.A.
ODOE contact: Chase McVeigh-Walker
Applicant/Certificate holder contact: Ben Mallernee
​​

Project Timeline

​​​

  
Additional Documents
  
12/12/2025
12/30/2025
Public Informational Meeting
01/13/2026
Public Comment on NOI Closes at 5:00 pm PT
01/30/2026

​​

​​
​Contact the Facility Siting Team:
​​​​​​​​​​​​​​​
​​​​​​​​Sign Up For Email Updates​


Exhibit Files Reference

  • Exhibit A: Applicant Information 
  • Exhibit B: Project Description
  • Exhibit C: Property Location and Maps
  • Exhibit D: Organizational Information
  • Exhibit E​: Permits Required
  • Exhibit F: Property Ownership 
  • Exhibit G: Materials Analysis
  • Exhibit H: Geology and Soil Stability 
  • Exhibit I: Soils
  • Exhibit J: Wetlands
  • Exhibit K: Land Use
  • Exhibit L: Protected Areas
  • Exhibit M: Financial Analysis
  • Exhibit N​: Non-generating Facility Information
  • Exhibit O: Water Requirements
  • Exhibit P: Fish Wildlife Habitat 
  • Exhibit Q: Threatened and Endangered Plants and Animals
  • Exhibit R: Scenic Aesthetic Values 
  • Exhibit S: Cultural Resources
  • Exhibit T: Recreational Facilities 
  • Exhibit U: Public Services
  • Exhibit V​: Waste Minimization 
  • Exhibit W: Site Restoration
  • Exhibit X: Noise 
  • Exhibit Y: Carbon Dioxide Emissions 
  • Exhibit Z: Cooling Towers  
  • Exhibit AA: EMFs – Electric and Magnetic Fields
  • Exhibit BB: Other Information
  • Exhibit CC: Additional Statutes Rules Ordinances
  • Exhibit DD​: Other Specific Standards