Water Quality Permits


For dredging projects

  • Portland Sediment Evaluation Team Memorandum
    Any project that involves dredging, dam removal, or any other kind of discharge of sediment will require coordination with the PSET team. DEQ will require a copy of the PSET memorandum prior to issuance. Protocols for sediment characterization and chemical analysis have been developed by a multi-agency workgroup led by the USACE; DEQ is a member of this group.

For projects that add or redevelop impervious surfaces

2018 Post-Construction Stormwater Management Plan Submission Guidelines

Oregon Administrative Rules

U.S. Environmental Protection Agency

Natural Resource Conservation Service

Oregon Department of State Lands

Program contacts

Sara Slater, Program Coordinator
541-633-2007